Installation: Core Power Unit & Expansion Pack
Remove OEM batteries: disconnect the OEM batteries (negative first), then remove the OEM Group 31 batteries from the battery box.
Mark & drill mounting holes: the height plate makes up the shelf-height difference left by the OEM Group 31 batteries and doubles as the drilling template. Note: the height plates are specific to the Peterbilt 579 reference vehicle; other trucks may require custom spacers, but the plate is always used to mark the mounting-hole centers. 1) Set a height plate with its vertical (short) leg flat against the rear wall of the battery box, or against the closest plane if a bracket, bolt, or other feature protrudes farther than the wall. 2) Use the notch in the plate to mark a center line across the box — the notch sets the front-to-back distance of the hole centers from the rear wall. 3) Mark the Core Power (left-most) hole: measure 1.25 inches (32mm) from the left-most wall (1 inch / 25mm minimum) and mark a second center line; where it crosses the first line is your first drill point, for a 9/32 inch (7mm) hole. 4) Line up the left edge of the height plate with that first mark and use the plate to mark the next center line, creating a second mark to the right. 5) If no Expansion Pack is used, drill both 9/32 inch (7mm) holes now; if an Expansion Pack is used, mark a third point the same way, then drill all three.
Install the height plate: clean the battery-box floor where the plate will sit. Remove the protective film from the VHB tape on the underside of the plate, align the plate's slots over the drilled holes, set it in place, and press firmly to bond.
Install the tie-down brackets: one tie-down bracket (P1006) mounts on each side (left and right) of the Core Power Unit. 1) Fasten a tie-down bracket to the left side and another to the right side, using two 10-32 pan-head screws per bracket, each with a flat washer and a lock washer. 2) If an Expansion Pack is used, fasten its tie-down brackets the same way. 3) When an Expansion Pack is installed, the adjacent Core and Expansion tie-down brackets overlap at the shared center rod — a slot in each bracket lets one sit higher and one lower; adjust them if they interfere. 4) Torque the 10-32 screws per the Torque Specifications article.
Set & secure the Core Power Unit: 1) Set the Core Power Unit onto the height plate, aligning each tie-down bracket over its drilled hole. 2) At each bracket, secure the 1/4-20 rod to the top of the bracket with a flat washer, a thin nut, and a nylon lock nut. 3) Pass the rod down through the height plate and the battery-box floor hole, and secure it underneath with a flat washer, a thin nut, and a nylon lock nut. 4) At each end, run the thin nut and lock nut together as a jam nut so you can hold one side while tightening the other, keeping the rod from spinning — torque per the chart and do not over-tighten. 5) If an Expansion Pack is used, mount it directly beside the Core Power Unit (side by side); the Core Power Unit and Expansion Pack share the center mounting rod.
Expansion Pack connections (if used): 1) Connect the Expansion Pack 48V positive lead to the Core Power 48V POSITIVE post (5/16 inch ring terminal), hand-tighten. 2) Connect the Expansion Pack ground lead to the Core Power SYSTEM GROUND post, hand-tighten.
OEM ground: connect the OEM chassis ground cable to the SYSTEM GROUND post (5/16 inch), hand-tighten only — this post is torqued once every SYSTEM GROUND terminal is landed.
12V, HMI power & alternator: 1) Connect the OEM 12V load cable to the 12V POSITIVE post (5/16 inch ring terminal), hand-tighten. 2) Land the HMI 48V power leads on the 48V POSITIVE and SYSTEM GROUND posts (5/16 inch ring), keeping the inline fuse on the positive lead, hand-tighten. 3) Mount the 300A post fuse (C1014) at the alternator and connect the alternator charge output to one side of the fuse. 4) Crimp a 3/8 inch ring terminal on one end of the 4 AWG red cable and slide on and shrink the red 1/2 inch heat-shrink. 5) Land that 3/8 inch ring on the fuse, on the side opposite the alternator feed. 6) Route the 4 AWG cable to the Core Power 12V POSITIVE post and zip-tie it in place. 7) Trim the cable to length at the Core Power end, then crimp a 5/16 inch ring terminal and shrink the heat-shrink. 8) Land the 5/16 inch ring on the 12V POSITIVE post, hand-tighten.
Starter connection (made last among high-current connections): the STARTER ONLY post must be completely isolated from everything except the starter. DANGER: run ONE cable, and only one cable, from the engine starter to the STARTER ONLY post — do NOT connect any battery, load, charger, or additional cable to this post; any extra connection lets power back-feed into the starting system and WILL damage it. DANGER: the STARTER ONLY post can hold stored energy from the ultracapacitor — make this connection with the system disabled and verify polarity first. 1) Reuse the existing OEM starter cable and land its battery-end lug on the STARTER ONLY post (8mm stud — use the 8mm nut, not a 5/16 inch nut). 2) If any other cables are currently landed on the OEM starter post, relocate each to a different 12V+ post to isolate the starter (the alternator+ is a good place if needed) — do not leave them on the STARTER ONLY post. 3) Confirm nothing else is landed on the STARTER ONLY post; this post feeds the engine starter solenoid ONLY. Note: STARTER SYSTEM ENABLE is the Starter System power button on the unit, not a wired connection — it is switched on during commissioning.
Torque all high-current connections: with every ring terminal landed, torque each high-current post connection once (48V POSITIVE, 12V POSITIVE, SYSTEM GROUND, STARTER ONLY) per the Torque Specifications article. Before torquing a shared post, confirm all of its terminals are in place so a joint is not loosened and re-tightened.
Front panel sense & control: land the voltage-sense and temperature-probe wires in the front-panel connector, then plug it into the panel. 1) Strip about 1/8 inch (3mm) of insulation from each of the three wires (voltage sense, temp+, temp-). 2) For each wire, back out its terminal screw to open the clamp, insert the stripped wire, then tighten the screw to clamp it, in the marked positions for ALTERNATOR VOLTAGE SENSE, ALTERNATOR TEMP+, and ALTERNATOR TEMP-. 3) Once all three wires are landed, insert the connector into the front panel and secure it with the two connector screws. 4) Run the voltage-sense wire to the alternator output stud (the source) so the system reads true alternator voltage; install the 2A inline fuse within 12 inches of the source, then crimp a 3/8 inch ring terminal and land it on the stud. 5) Mount the temperature probe on the alternator frame, not on the positive terminal, per the probe instructions.
CAN connection: connect the 90-degree elbow end of the HMI Assembly CAN cable (routed during HMI installation) to the CAN NETWORK CONNECTION / HMI port. The straight end connects to the HMI in the cab.