Core Power Unit
Operation, maintenance, and installation guides for the IdleX Core Power Unit (eAPU) and Expansion Pack.
Core Power Unit: overview & specifications
What the Core Power Unit is, its three subsystems, and full spec sheet for Core Power & Expansion Pack.
Safety information & PPE
Hazards, required PPE, and emergency procedures for working around the Core Power Unit.
Terminal & connector reference
Every labeled post and front-panel connector on the Core Power Unit, what it does, and what it connects to.
Operating the Core Power Unit
Start-up and shutdown sequences, monitoring, and engine starting via the Starter System.
Jump-starting a discharged Core Power Unit
Recovery procedure for a Core Power Unit that has fully discharged and will not power on.
Maintenance schedule & procedures
Routine maintenance intervals, power terminal and battery care, and safely discharging the Starter System.
Troubleshooting the Core Power Unit
Common symptoms, likely causes, and corrective actions for power, converter, and engine-start faults.
Installation: overview, compliance & safety
Scope of the Installation Manual, applicable codes, and electrical/drilling safety before you begin.
Installation: tools, materials & kit bill of materials
Required tools and the full parts breakdown for each provided kit (K1001–K1007).
Installation: HMI Assembly
Mounting the HMI display, routing its power/CAN cables, and connecting at the HMI end.
Installation: Core Power Unit & Expansion Pack
Removing OEM batteries, mounting the unit, and landing every high- and low-current connection.
Commissioning, testing, final checklist & torque specs
Pre-power checks, power-up and functional tests, the sign-off checklist, and every fastener torque value.