IdleX Support

Contact Us

Operating the Core Power Unit

System start-up sequence: 1) Ensure the Shipping Switch is enabled. 2) Press the 48V system power button on the front panel and wait 5 seconds for the system to come fully online. 3) Press the power button on the Starter System — the green LED ring will flash while charging; wait until it is solid before moving on. 4) Verify state of charge shows on the HMI (actual percentage will vary). 5) Energize 48V and 12V loads.

System shut-down sequence: 1) Turn off all 48V and 12V loads. 2) Allow the DC-DC to idle (no charge/discharge activity on the HMI). 3) Press and hold the 48V system power button on the front panel for 5 seconds to power down the battery. 4) Verify via the HMI, or with a multimeter, that the 48V voltage has dropped.

Monitoring: the unit can be monitored through the connected HMI on the CAN network, or through the IdleX mobile app and Fleet & Driver Portal (Android/iOS, coming soon).

Engine starting: the Starter System supplies high-current cranking power through the STARTER ONLY post and charges automatically from the system. A blinking green LED indicates the module is charging; when blinking stops, the module is charged and ready to start the engine; a single short LED flash on a button press confirms the module is ON.

CAUTION: If the engine fails to crank after extended parking, confirm the Starter System is ON (press the button — the LED should light for about 5 seconds) and allow it to finish charging before attempting a start.

WARNING: If a jump start is ever required, do NOT connect jump leads to the Starter System post. Connect only to the 12V post and Ground post on the Core Power Unit.

Shipping Disable Switch: on the front panel, places the unit in a safe, low-activity state for transport or storage. Set it to the disabled position before shipping or extended storage, and return it to the enabled (run) position before operation.

Didn't find what you needed?

Contact Support